Solution 01 · HVAC & Ductwork

Deliver HVAC models that contractors can build.

An end-to-end approach for MEP consultants and contractors: from design intent to coordinated, LOD 400 ductwork, shop drawings and material quantities.

LOD 400
fabrication-ready ductwork
−70%
modeling hours
0
fittings drawn by hand
1 week
team onboarding

Built for your role

Every team on the project gets something different

MEP contractors

Turn design models into installable ductwork with fittings, dampers and hangers in place.

Outcome: Shop drawings in days
Design consultants

Explore layouts quickly and keep design changes from breaking the model.

Outcome: Faster design iterations
BIM coordinators

Resolve clashes in crowded ceilings, with sleeves and openings ready.

Outcome: Fewer clashes on site
Procurement teams

Pull duct, fitting and support quantities straight from a reliable model.

Outcome: Accurate material orders

The scope

Covering the whole system

HVAC & Ductwork model in Revit
Air terminals & branchesEvery diffuser, grille and FCU connected to its branch with the right takeoff.

What you deliver

Deliverables at every project stage

The same model carries from design to handover, so nothing is redrawn between stages.

  1. Stage 1 · DesignConcept to LOD 300
    • Duct layout by zone
    • Terminal schedule
    • Design option studies
  2. Stage 2 · CoordinationClash-free model
    • Coordinated ceiling voids
    • Sleeve & opening layout
    • Clash reports closed
  3. Stage 3 · ConstructionLOD 400 shop drawings
    • Fabrication lengths
    • Hanger layout plans
    • Material quantities (BOQ)
  4. Stage 4 · HandoverAs-built & O&M
    • Tagged, documented model
    • Equipment data
    • Model for facility teams

Example project

A 25-storey office tower, modeled in half the time

Office tower
Scope
HVAC + supports
Team
4 modelers
Size
62,000 m²

The contractor had six weeks to deliver LOD 400 ductwork for 25 floors. Terminal connections, fittings and hangers were generated per floor, then copied and adjusted, leaving the team free to focus on coordination.

Before11 weeksestimated manual modeling
With FlashBIM5 weeksdelivered, coordinated

How we work with your team

More than software: a rollout your team actually uses

  1. 01Assess

    We review a sample of your project and your current workflow.

  2. 02Set up standards

    Your families, fittings and naming loaded into the add-ins.

  3. 03Train

    Hands-on sessions on your own model, plus video manuals.

  4. 04Support

    Direct help by email, WhatsApp and support tickets during delivery.

Powered byS-MEPMEP SleeveLicensed per user or as a team package

Resources for HVAC & Ductwork teams

Plan your HVAC & Ductwork project with a FlashBIM expert.

Tell us about your project. We reply with a suggested setup, rollout plan and team quote.

“It helped me solve the problem, creating supports very quickly and accurately.”Bradley Secker, Speed Hanger user

Sends from your email app. Prefer to write yourself? Write to [email protected].

Explore other solutions

All solutions